Product Detail
FAQ
Product Tags
Related Video
Feedback (2)
We have our own sales team, design team, technical team, QC team and package team. We have strict quality control procedures for each process. Also, all of our workers are experienced in printing field for Ttvs, Klixon Thermal Overload Switch, Gas Water Heater, Welcome to visit us at any time for business relationship established.
100% Original Factory UL Thermal Cutoffs - PELLET TCO – RY – Aupo Detail:
Model No
|
a
|
b
|
c
|
d
|
e
|
f
|
RY
|
20±1.0
|
11±1.0
|
35±1.0
|
Ф1.0±0.1
|
Ф4.0±0.1
|
Ф1.0±0.1
|
Model NO. |
Tf(℃) |
Fusing-offTemperature (℃) |
Tm(℃) |
Tm(℃) |
Ir(A) |
Ur(V) |
RY73 |
73 |
73+0/-10 |
45 |
150 |
10 |
250 |
RY77 |
77 |
77+0/-10 |
51 |
150 |
10 |
250 |
RY84 |
84 |
84+0/-10 |
58 |
150 |
10 |
250 |
RY94 |
94 |
94+0/-10 |
66 |
150 |
10 |
250 |
RY99 |
99 |
99+0/-10 |
71 |
150 |
10 |
250 |
RY104 |
104 |
104+0/-10 |
79 |
150 |
10 |
250 |
RY113 |
113 |
113+0/-10 |
84 |
150 |
10 |
250 |
RY117 |
117 |
117+0/-10 |
92 |
160 |
10 |
250 |
RY121 |
121 |
121+0/-10 |
94 |
160 |
10 |
250 |
RY133 |
133 |
133+0/-10 |
104 |
160 |
10 |
250 |
RY142 |
142 |
142+0/-10 |
114 |
160 |
10 |
250 |
RY157 |
157 |
157+0/-10 |
127 |
172 |
10 |
250 |
RY172 |
172 |
172+0/-10 |
144 |
189 |
10 |
250 |
RY184 |
184 |
184+0/-10 |
159 |
210 |
10 |
250 |
RY192 |
192 |
192+0/-10 |
170 |
250 |
10 |
250 |
RY216 |
216 |
216+0/-10 |
191 |
280 |
10 |
250 |
RY229 |
229 |
229+0/-10 |
200 |
250 |
10 |
250 |
RY240 |
240 |
240+0/-10 |
200 |
300 |
10 |
250 |
RY257 |
257 |
257+0/-10 |
200 |
450 |
10 |
250 |
Model No.
|
VDE
|
CCC
|
RY73
|
40005418
|
2003010205052188
|
RY77
|
RY84
|
RY94
|
RY99
|
RY104
|
RY113
|
RY117
|
RY121
|
RY133
|
RY142
|
RY157
|
RY172
|
RY184
|
RY192
|
RY216
|
RY240
|
RY257
|
○
|
○
|
|
|
○ pending
|
Product Description:
- AUPO BF series product is non-resettable pellet type thermal fuse which prevents electrical appliances from overheating. It has a metal case with pellet material inside and could be used in high current circuits.
- Pellet type BF series thermal fuse: when ambient temperature rises to its operating temperature, the pellet will melt, and the spring A can be released to push the star contact that there is no contact with the pin, thus cutting off the circuit permanently.
Advantages:
- 1. Unique pellet formula technology to ensure stable operation and high precision.
- 2. Complete product quality management system to ensure high consistency and reliability of products.
- 3. Metal casing design, high sensitivity to temperature rise.
- 4. Applicable to overheating protection under 10A-16A circuit.
Application Field:
- BF series products are widely used for overheating protection of household appliances, such as small household appliances, refrigerator, washers, kitchen and bathroom appliances; automotive appliances and office equipment,etc.
Product Certification:
- BF series products meet the safety test requirements of IEC 60691 Ed 4.0 and GB/T 9816.2013, and many models are certified with UL, VDE, CCC, PSE, KC and other safety approvals.
Product detail pictures:
Related Product Guide:
owing to good service, a variety of high quality products, competitive prices and efficient delivery, we enjoy a good reputation among our customers. We are an energetic company with wide market for 100% Original Factory UL Thermal Cutoffs - PELLET TCO – RY – Aupo , The product will supply to all over the world, such as: America, Malta, Portugal, We aspire to meet the demands of our customers globally. Our range of merchandise and services is continuously expanding to meet customers' requirements. We welcome new and old customers from all walks of life to contact us for future business relationships and achieving mutual success!
Company director has very rich management experience and strict attitude, sales staff are warm and cheerful, technical staff are professional and responsible,so we have no worry about product,a nice manufacturer.
By Lisa from Mauritius - 2017.12.02 14:11
This manufacturers not only respected our choice and requirements, but also gave us a lot of good suggestions, ultimately, we successfully completed the procurement tasks.
By Natividad from Lyon - 2017.08.18 11:04